Staged rollouts
Push a model version to a group, a line, a site or the whole estate. Every deployment is reversible from the same screen.
VRTLST Edge v2 ships with on-device inference at 38 ms
Read moreVRTLST Command
Command is the control plane. Once you are past the first line, the hard part is not the model — it is knowing which model version is on which camera at which site, and who changed it. Command is where that lives.
What it does
Push a model version to a group, a line, a site or the whole estate. Every deployment is reversible from the same screen.
Command benchmarks each deployment against its own history and flags the ones sliding, before anyone on the floor notices.
SSO, role-based permissions, and a complete record of who deployed what, where, and when.
How it works
The control plane for your whole visual estate — deployments, model versions, alerts, access and audit.
Specifications
What your integrator will ask for on the first call.
Getting started
The same shape every time, whichever product you start with.
Send us recorded video from a single line. We come back with what the model found in it — before anyone signs anything.
We stand up a pilot on the line that hurts most, using the cameras already mounted. Operators start correcting it on day one.
The verdict moves from a dashboard to the PLC, the MES or the alerting channel your shift leads actually watch.
The model and its thresholds travel. Command stages the rollout so a bad version never reaches more than one line.
Corrections accumulate, drift gets flagged, and new defect classes are a fine-tune rather than a project.
No, a single pilot line runs fine without it. Command earns its place at the second site, when knowing which version is where stops being something one person can hold in their head.
Over a link you control for on-prem. Air-gapped sites are managed through signed model bundles that move on media, with the audit trail reconciled when they are applied.
Each deployment is benchmarked against its own history rather than a global baseline, so Command flags the line whose confidence distribution has moved, not the line that was always hardest.
Yes. Roles go down to the individual site, and deployment rights are separate from viewing rights.
Keep exploring
Detection, segmentation, tracking and classification from a single deployment — no per-camera retraining.
Explore VisionSub-millimetre surface inspection at line speed, with a decision the PLC can act on.
Explore InspectDraw a boundary once. Guard enforces it on every shift, on every camera, without a human staring at a wall of screens.
Explore GuardGet started
Send us one hour of footage from one line. We'll come back with what the model found in it.